Select Page

Kellner Building Group

Let’s Build a Better Space

Project 1

As Project Manager for this flexible floor at Arizona Public Service, I was able to have fun with the design team in developing a colorful floor to stimulate the creative teams working long hours to solve project specific work. Flexible furniture encourages impromptu meetings and white board coated walls allows for problem solving on the fly.

Project 2

Before and After shots of this executive atrium show what a little paint, some new furniture, artwork and rugs can do to freshen up a space! It was a bit of a challenge to work with the 80’s mauve granite but in the end everyone was happy.

Before

Before

Before

After

After

After

Project 3

This full floor 20,000 s.f. remodel was a typical project for this customer as they worked their way through the corporate office tower. My work included design oversight, bidding general contractors, move management, construction oversight, scope control, change management, financial reporting and schedule adherence. Once construction was substantially complete, it was my job to be sure the furniture was installed per plan, power and data is connected and tested, computer workstations and all A/V is working properly before moving teams back onto the floor. Project close out and lessons learned complete the process and I love it!

Before

Before

After

After

Project 4

Project Name: Sempra Energy – San Diego, CA.

Project Scope: 25,000 s.f.  gut/renovation including all new mechanical, plumbing and electrical work. As a design project manager my work included space planning, conceptual design and presentations, FFE (furniture, fixture, equipment) solutions, cost estimating, construction oversight, financial reporting and project close out.

602 763 7343

Call Us

PO BOX 44297 
Phoenix, AZ 85064

Contact Us

Kellner Building Group 
Let's Build a Better Space
© Kellner Building Group. All rights reserved.